Minnesota Department of Transportation

511 Travel Info

Standard Plans

Standard Drawings for use in Construction Plans

Skip Navigation Links
PlanStandard Plan TitleAppr. / Rev. DateUpdate
5-297. 001 Standard Plans Manual (pdf) 2/20/2024 24-01
5-297. 003 Standard Plans Index Spreadsheet (xlsx) 10/11/2023 23-04
5-297. 106 Standard Acceleration and Deceleration Lanes (Rural) Bit. Pavement 5/27/2014 14-02
5-297. 108 Standard Acceleration and Deceleration Lanes (Urban) Bit. Pavement 5/27/2014 14-02
5-297. 111 Right and Left Turn Lanes 5/27/2014 14-02
5-297. 115 Staking Information Sheet 8/06/2014 14-04
5-297. 209 Acceleration and Deceleration Lane (Open) Concrete Pavement 15 Ft. Panel Length 10/03/2022 22-07
5-297. 210 Acceleration and Deceleration Lane (Curbed) Concrete Pavement 15 Ft. Panel Length 10/03/2022 22-07
5-297. 217 Concrete Mainline Pavement 15 Ft. Panel Length (Rural) 2/16/2016 16-01
5-297. 219 Concrete Ramp Pavement 15 Ft. Panel Length 2/16/2016 16-01
5-297. 220 Safety Edge 2/21/2024 24-02
5-297. 221 Pavement Joints Contraction (Design C) 10/03/2022 22-07
5-297. 222 Bridge Approach Panel Layout (Type F Concrete Barrier on Wingwall) 8/22/2016 16-05
5-297. 223 Bridge Approach Panel Reinforcement Details (Type F Concrete Barrier on Wingwall) 8/22/2016 16-05
5-297. 224 Bridge Approach Panel Layout (Type F Concrete Barrier on Approach Panel) 8/22/2016 16-05
5-297. 225 Bridge Approach Panel Reinforcement Details (Type F Concrete Barrier on Approach Panel) 8/22/2016 16-05
5-297. 227 Bridge Approach Panel Miscellaneous Details (Type F Concrete Barrier) 8/22/2016 16-05
5-297. 228 Bridge Approach Panel Joint Layout (Type F Concrete Barrier) 8/22/2016 16-05
5-297. 229 Bridge Approach Panel Joint Details 3/22/2013 13-01
5-297. 231 Bridge Approach Panel Drainage Details (Type F Concrete Barrier) 8/22/2016 16-05
5-297. 233 Bridge Abutment Approach Treatment for Abutment on Footing 8/22/2019 19-06
5-297. 234 Bridge Abutment Approach Treatment for Integral Abutments 8/22/2019 19-06
5-297. 235 Pavement End Anchors Under Concrete Pavement (Grades 4% or Greater) 8/06/2014 14-04
5-297. 250 Pedestrian Curb Ramp Details 11/04/2021 21-08
5-297. 254 Driveway and Sidewalk Details 11/04/2021 21-08
5-297. 301 Standard Planting Details 2/14/2019 19-02
5-297. 302 Protection and Restoration of Vegetation 12/11/2015 15-03
5-297. 404 Permanent Erosion Control - Along Roadways, Ditches, and Flumes 2/28/2017 17-02
5-297. 405 Temporary Sediment Control-Silt Curtain or Silt Fence Type TB 2/28/2017 17-02
5-297. 407 Permanent Erosion Control Bioengineering Soil Stabilization 8/06/2014 14-04
5-297. 409 Temporary Erosion Control – Temporary Poly Coverings 2/28/2017 17-02
5-297. 430 Subsurface Drains 8/06/2014 14-04
5-297. 431 Subsurface Drains 8/06/2014 14-04
5-297. 432 Subsurface Drains 8/06/2014 14-04
5-297. 433 Subsurface Drains, Outlet Pipes for Edge and Subcut Drains 8/06/2014 14-04
5-297. 440 Standard Culvert Bedding for Flexible Pipe 1/18/2019 19-01
5-297. 441 Standard Culvert Bedding for Rigid Pipe 1/18/2019 19-01
5-297. 442 Standard Storm Sewer Bedding for Rigid and Flexible Pipe 1/18/2019 19-01
5-297. 601 Guardrail / End Treatments Miscellaneous Details 5/14/2021 21-06
5-297. 603 W-Beam Transition to Concrete F-Shape Safety Rail With Approach Curb (Steel Post) 5/27/2014 14-02
5-297. 605 W-Beam Transition to Concrete F-Shape Safety Rail With Approach Curb (Wood Post) 5/27/2014 14-02
5-297. 607 W-Beam Transition to Concrete J-Shape Safety Rail With Approach Curb (Wood Post) 11/17/2016 16-07
5-297. 608 Guardrail Transition to Glulam Timber Bridge Rail 3/26/2021 21-04
5-297. 609 W-Beam Transition to Concrete End Post With or Without Approach Curb (Wood Post) 11/17/2016 16-07
5-297. 611 Thrie-Beam Bullnose Guardrail for Medians - System Widths 14' 2-1/2" to 24' Misc. Details 2/09/2023 23-01
5-297. 612 Proprietary End Terminal - Tangent For Type 31 Guardrail 11/02/2021 21-08
5-297. 613 Proprietary End Terminal - Flared For Type 31 Guardrail 11/02/2021 21-08
5-297. 616 Driveway Terminal 2/09/2023 23-01
5-297. 618 W-Beam Transition to Concrete J-Shape Safety Rail With Approach Curb (Steel Post) 11/17/2016 16-07
5-297. 619 W-Beam Transition to Concrete End Post With or Without Approach Curb (Steel Post) 11/17/2016 16-07
5-297. 620 Retaining Wall General Notes and Summary of Quantities 9/01/2016 16-06
5-297. 621 Retaining Wall Reinforcement Details (Short Walls) 9/01/2016 16-06
5-297. 622 Retaining Wall Reinforcement Details (Medium Walls) 9/01/2016 16-06
5-297. 623 Retaining Wall Reinforcement Details (Tall Walls) 9/01/2016 16-06
5-297. 624 Retaining Wall Miscellaneous Details 9/01/2016 16-06
5-297. 625 Retaining Wall Shear Lug Details 8/27/2014 14-05
5-297. 626 Retaining Wall Panel Tabulations (Level Fill) 9/01/2016 16-06
5-297. 627 Retaining Wall Panel Tabulations (1V:2H Sloped Fill) 9/01/2016 16-06
5-297. 628 Retaining Wall Panel Tabulations (Live Load Surcharge) 9/01/2016 16-06
5-297. 630 Retaining Wall (Level Fill) Spread Footing Geometry and Data 9/01/2016 16-06
5-297. 631 Retaining Wall 1(V):2(H) Sloped Fill Spread Footing Geometry and Data 9/01/2016 16-06
5-297. 632 Retaining Wall (Live Load Surcharge) Spread Footing Geometry and Data 9/01/2016 16-06
5-297. 633 Retaining Wall Concrete Parapet (Type P-1) 9/01/2016 16-06
5-297. 634 Retaining Wall Concrete Parapet (Type P-4) 9/01/2016 16-06
5-297. 635 Retaining Wall Concrete Barrier (Type F, TL-4) 9/01/2016 16-06
5-297. 636 Retaining Wall Concrete Barrier (Type S, TL-4) 9/01/2016 16-06
5-297. 638 Concrete Retaining Wall Rustication 8/27/2014 14-05
5-297. 639 Cast In Place Concrete Retaining Wall Basis of Design 8/27/2014 14-05
5-297. 640 Modular Block Retaining Wall General Notes 3/29/2023 23-02
5-297. 641 Modular Block Retaining Wall Soil Reinforcement for Level Fill, Case 1 3/29/2023 23-02
5-297. 643 Modular Block Retaining Wall Soil Reinforcement for 1V:2H Fill Slope, Case 2 3/29/2023 23-02
5-297. 644 Modular Block Retaining Wall Soil Reinforcement for 1V:3H Fill Slope, Case 3 3/29/2023 23-02
5-297. 645 Modular Block Retaining Wall Details 3/29/2023 23-02
5-297. 646 Reinforced Soil Slope General Notes 3/29/2023 23-02
5-297. 647 Reinforced Soil Slope (45° Maximum Slope) 3/29/2023 23-02
5-297. 648 Reinforced Soil Slope (70° Maximum Slope) 3/29/2023 23-02
5-297. 649 Reinforced Soil Slope Details 3/29/2023 23-02
5-297. 661 Wood Planking Noise Barrier With Concrete Posts 10/22/2019 19-07
5-297. 678 Glue Laminated Rubrail (Concrete Posts) General Layout: Planking on Residential Side 10/22/2019 19-07
5-297. 680 Temporary Portable Precast Concrete Barrier Anchoring 7/16/2019 19-05
5-297. 681 Concrete Median Barrier Single Slope - Type 36 A, 42 A, and 54 A 7/22/2020 20-06
5-297. 682 Barrier Gap Rail (BGR) System for Single Slope Concrete Barrier 10/11/2023 23-04
5-297. 684 W-Beam Transition to Pier Columns Without Approach Curb (Steel Post) 11/17/2016 16-07
5-297. 686 Box Beam Transition to Concrete F-Shape Barrier 5/27/2014 14-02
5-297. 688 High Tension Cable Barrier (HTCB) Median Placement, Overlap, and Utility Crossings - Sheet 1 of 2 2/28/2022 22-02
5-297. 690 Traffic Barrier Type 31 Assembly Details 7/05/2022 22-06
5-297. 692 Traffic Barrier Type 31 End Anchorage Assembly Details 2/09/2023 23-01
5-297. 693 Approach Guardrail Transition (AGT) Type 31 at Vertical End Post - Assembly Details 7/05/2022 22-06
5-297. 694 Approach Guardrail Transition (AGT) Type 31 at Single Slope End Post - Assembly Details 7/05/2022 22-06
5-297. 695 Approach Guardrail Transition (AGT) Type 31 at F-Shape and J-Shape Barrier - Assembly Details 7/05/2022 22-06
5-297. 696 Traffic Barrier Type 31 Omitted Post Details 2/09/2023 23-01
5-297. 697 Short Radius Guardrail at Intersection 2/09/2023 23-01
5-297. 701 Standard Sign Placement 8/09/2023 23-03
5-297. 702 Delineator and Marker Placement 2/28/2022 22-02
5-297. 703 Sign, Delineator, and Marker Placement Near Interchange Ramp Gores 2/28/2022 22-02
5-297. 710 Extruded Panel Mounting Details 11/29/2022 22-08
5-297. 711 I-Beam Supported Sign Structural Details - Footings and Base Connection 5/03/2021 21-05
5-297. 713 I-Beam Supported Sign Structural Details - Shallow Spread Foundation 5/03/2021 21-05
5-297. 718 Square-Tube Sign Mounting Details 8/09/2023 23-03
5-297. 719 Square Tube Side-By-Side Sign Mounting Details 8/09/2023 23-03
5-297. 720 Square Tube No Passing Zone Sign Mounting Details 8/09/2023 23-03
5-297. 721 Three-Wall Base 11/29/2022 22-08
5-297. 722 Fin Base - For 2" Square-Tube Riser Post In Soil 8/09/2023 23-03
5-297. 724 Slip Base Assembly - For 2-1/2" Square-Tube Riser Post 8/09/2023 23-03
5-297. 726 Sign Mounted on Concrete Wall 5/03/2021 21-05
5-297. 730 Sign Mounting Systems for Round Supports 10/16/2019 19-07
5-297. 731 Sign Mounting Details for Signal Mast Arms 4/17/2020 20-03
5-297. 740 Concrete Rail Mounted Sign 6/04/2019 19-03
5-297. 741 Structural Details For Bridge-Mounted Grade-Separated Identification Signs 8/09/2023 23-03
5-297. 742 Structural Details For Bridge-Mounted Flat Sheet Aluminum Signs 8/09/2023 23-03
5-297. 745 Monotube Overhead Sign Structures 11/29/2022 22-08
5-297. 746 Monotube Overhead Sign Structures - Foundation Details 1/15/2021 21-01
5-297. 747 Monotube Overhead Sign Structures - Simple Span - Post and Baseplate Details 1/15/2021 21-01
5-297. 748 Monotube Overhead Sign Structures - Cantilever - Post and Baseplate Details 1/15/2021 21-01
5-297. 749 Monotube Overhead Sign Structures - Sign Panel and Exit Panel Geometry 1/15/2021 21-01
5-297. 750 I-Beam And Panel Mounting Post Modification Details 8/09/2023 23-03
5-297. 752 Type F Median Barrier Foundation - Spread Footing 3/11/2022 22-02
5-297. 753 Type F Median Barrier Foundation - Drilled Shaft Footing 3/11/2022 22-02
5-297. 754 Single Slope Median Barrier Foundation - Spread Footing 3/11/2022 22-02
5-297. 755 Single Slope Median Barrier Foundation - Drilled Shaft Footing 3/11/2022 22-02
5-297. 760 Standard Overhead Sign Structures - Design D - Implementation Instructions and Notes 5/28/2019 19-03
5-297. 761 Standard Overhead Sign Structures - Design D 11/29/2022 22-08
5-297. 762 Standard Overhead Sign Structures - Design D - Camber, Post Type, and Estimated Quantities 3/05/2020 20-02
5-297. 763 Standard Overhead Sign Structures - Design D - Foundation Details 2/14/2022 22-02
5-297. 764 Standard Overhead Sign Structures - Design D - Base Plate, Handhole, Electrical, and Cover Plate Details 3/05/2020 20-02
5-297. 765 Standard Overhead Sign Structures - Design D - Truss-to-Post Connection Details 3/05/2020 20-02
5-297. 766 Standard Overhead Sign Structures - Design D - Sign Truss Details Type A 5/28/2019 19-03
5-297. 767 Standard Overhead Sign Structures - Design D - Sign Truss Details Type B 5/28/2019 19-03
5-297. 768 Standard Overhead Sign Structures - Design D - Sign Truss Details Type C 5/28/2019 19-03
5-297. 769 Standard Overhead Sign Structures - Design D - Walkway Details 3/05/2020 20-02
5-297. 770 Standard Overhead Sign Structures - Design D - Walkway and Railing Retrofit Details 5/01/2019 19-03
5-297. 772 Standard Overhead Sign Structures - Design D - DMS Mounting Details 3/23/2022 22-03
5-297. 773 Standard Overhead Sign Structures - Design D - Rock Socket Foundation Details 1/15/2021 21-01
5-297. 774 Standard Overhead Sign Structures - Design D - Variable Length Drilled Shaft Details 1/15/2021 21-01
5-297. 779 Overhead Sign Structures - Foundation Extension - Design D Extension Details - Type 1-4 Posts 1/15/2021 21-01
5-297. 780 Overhead Sign Structures - Foundation Extension - Design D Extension Details - Type 5-6 Posts 1/15/2021 21-01
5-297. 781 Overhead Sign Structures - Foundation Extension - Interim Design B Extension Details - Type 1-4 Posts 1/15/2021 21-01
5-297. 782 Overhead Sign Structures - Foundation Extension - Interim Design B Extension Details - Type 5-7 Posts 1/15/2021 21-01
5-297. 783 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 1-3 Posts 1/15/2021 21-01
5-297. 784 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 4-5 Posts 1/15/2021 21-01
5-297. 785 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 6-7 Posts 1/15/2021 21-01
5-297. 786 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 8-9 Posts 1/15/2021 21-01
5-297. 787 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 10-13 Posts 1/15/2021 21-01
5-297. 788 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 14-15 Posts 1/15/2021 21-01
5-297. 789 Overhead Sign Structures - Foundation Extension - Design B Extension Details - Type 16-19 Posts 1/15/2021 21-01
5-297. 801 Interim Pavement Markings and Signing 10/10/2019 19-07
5-297. 805 Temporary Overhead Sign Structures - General Elevation and Notes 3/06/2020 20-02
5-297. 811 Alternate Pedestrian Route (APR) Layouts 3/18/2021 21-03
5-297. 813 Temporary Pedestrian Access Route (TPAR) Devices - Channelizers, Sidewalk Barricades, and Portable Stands 3/18/2021 21-03
5-297. 840 T-100 Light Tower Pile Foundation Design 11/05/2019 19-07
5-297. 841 T-100 Light Tower Mat Foundation Design 11/05/2019 19-07
5-297. 861 Pole Foundation Type TS 2/21/2024 24-02
5-297. 869 350 ATCC and SSB Cabinet Equipment Pad - Cast in Place 2/22/2022 22-02
5-297. 870 352 ATCC and SSB Cabinet Equipment Pad - Cast in Place 2/22/2022 22-02
5-297. 885 Accessible Pedestrian Signal (APS) 2/21/2024 24-02
Show Records per page



View current Standard Plans








View Updates/Transmittals